Hutchinson, A.J. orcid.org/0000-0002-0342-0989, Gladwin, D.T. orcid.org/0000-0001-7195-5435, Eardley, S. et al. (8 more authors) (2025) Impact analysis of supplementing solar generation sites with additional wind generation considering grid connection delays. In: 2025 International Conference on Clean Electrical Power (ICCEP). 2025 International Conference on Clean Electrical Power (ICCEP), 24-26 Jun 2025, Villasimius, Italy. Institute of Electrical and Electronics Engineers (IEEE), pp. 141-146. ISBN: 9798331510541. ISSN: 2471-6189. EISSN: 2474-9664.
Abstract
Grid connection delays are currently causing significant issues for new renewable generation projects in Great Britain. The National Energy System Operator (NESO) has recently closed the connection queue to new requests, with over 700GW of new projects currently awaiting responses to connection requests. The average gap between requested and offered connection dates has increased to 5 years and despite an ongoing connection reform process the challenges faced by new renewable generation projects are putting net zero objectives at risk. In this paper, a novel techno-economic investigation is performed into the potential impact of increasing the generation capacity of a solar generation site through the addition of wind generation. The study considers varying time horizons for increased grid connections and how this impacts the levelized cost of energy (LCOE) and net present value (NPV) of the site. Results show positive implications with a 5 year connection delay, showing a possible reduction in LCOE of £1.86/MWh over a 20 year lifetime.
Metadata
| Item Type: | Proceedings Paper |
|---|---|
| Authors/Creators: |
|
| Copyright, Publisher and Additional Information: | © 2025 The Authors. Except as otherwise noted, this author-accepted version of a conference paper published in 2025 International Conference on Clean Electrical Power (ICCEP) is made available via the University of Sheffield Research Publications and Copyright Policy under the terms of the Creative Commons Attribution 4.0 International License (CC-BY 4.0), which permits unrestricted use, distribution and reproduction in any medium, provided the original work is properly cited. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ |
| Keywords: | connection delays; wind; solar; LCOE |
| Dates: |
|
| Institution: | The University of Sheffield |
| Academic Units: | The University of Sheffield > Faculty of Engineering (Sheffield) > School of Electrical and Electronic Engineering |
| Funding Information: | Funder Grant number ENGINEERING AND PHYSICAL SCIENCE RESEARCH COUNCIL EP/W02764X/1 |
| Date Deposited: | 12 Jan 2026 12:07 |
| Last Modified: | 12 Jan 2026 12:07 |
| Status: | Published |
| Publisher: | Institute of Electrical and Electronics Engineers (IEEE) |
| Refereed: | Yes |
| Identification Number: | 10.1109/iccep65222.2025.11143762 |
| Open Archives Initiative ID (OAI ID): | oai:eprints.whiterose.ac.uk:236406 |
Download
Filename: Solar_Wind_Grid_Connection_Ratios (1).pdf
Licence: CC-BY 4.0

CORE (COnnecting REpositories)
CORE (COnnecting REpositories)