Xu, M, Wang, G, Grant-Muller, S et al. (1 more author) (2017) Joint road toll pricing and capacity development in discrete transport network design problem. Transportation, 44 (4). pp. 731-752. ISSN 0049-4488
Abstract
The paper demonstrates a method to determine road network improvements that also involve the use of a road toll charge, taking the perspective of the government or authority. A general discrete network design problem with a road toll pricing scheme, to minimize the total travel time under a budget constraint, is proposed. This approach is taken in order to determine the appropriate level of road toll pricing whilst simultaneously addressing the need for capacity. The proposed approach is formulated as a bi-level programming problem. The optimal road capacity improvement and toll level scheme is investigated with respect to the available budget levels and toll revenues.
Metadata
Item Type: | Article |
---|---|
Authors/Creators: |
|
Copyright, Publisher and Additional Information: | (c) 2016, Springer. This is an author produced version of a paper published in Transportation. Uploaded in accordance with the publishers self-archiving policy. The final publication is available at Springer via http://dx.doi.org/10.1007/s11116-015-9674-2 |
Keywords: | Toll pricing; Road development; Discrete network design problem (DNDP); Bilevel programming; Relaxation algorithm. |
Dates: |
|
Institution: | The University of Leeds |
Funding Information: | Funder Grant number EU - European Union PIIF-GA-2011-300674 |
Depositing User: | Symplectic Publications |
Date Deposited: | 18 Jan 2016 15:54 |
Last Modified: | 02 Aug 2017 13:45 |
Published Version: | http://dx.doi.org/10.1007/s11116-015-9674-2 |
Status: | Published |
Publisher: | Springer Verlag |
Identification Number: | 10.1007/s11116-015-9674-2 |
Open Archives Initiative ID (OAI ID): | oai:eprints.whiterose.ac.uk:93226 |