Edwards, J.B. and Sadreddini, S.M. (1985) Progress on Combined Load-and Profile-Control for Horizontal-Turret, Single-and Double-arm Tunnelling Machines. Research Report. Acse Report 276 . Dept of Automatic Control and System Engineering. University of Sheffield
Abstract
This is the first progress report on investigations conducted by the authors entirely on NCB Research Contract No PSD 19 (84). The contract, which commenced 1 October 1984, follows on from Research Contract No 226072, work on which was devoted to studies related specifically to the Cadley Hill machine and that on trial at Middleton Mine: both single-boom tunnelling machines of the Horizontal-turret type (Fig 1a).
Metadata
Item Type: | Monograph |
---|---|
Authors/Creators: |
|
Copyright, Publisher and Additional Information: | The Department of Automatic Control and Systems Engineering research reports offer a forum for the research output of the academic staff and research students of the Department at the University of Sheffield. Papers are reviewed for quality and presentation by a departmental editor. However, the contents and opinions expressed remain the responsibility of the authors. Some papers in the series may have been subsequently published elsewhere and you are advised to cite the later published version in these instances. |
Dates: |
|
Institution: | The University of Sheffield |
Academic Units: | The University of Sheffield > Faculty of Engineering (Sheffield) > Department of Automatic Control and Systems Engineering (Sheffield) > ACSE Research Reports |
Depositing User: | MRS ALISON THERESA BARNETT |
Date Deposited: | 01 Nov 2013 09:38 |
Last Modified: | 24 Oct 2016 17:37 |
Status: | Published |
Publisher: | Dept of Automatic Control and System Engineering. University of Sheffield |
Series Name: | Acse Report 276 |
Open Archives Initiative ID (OAI ID): | oai:eprints.whiterose.ac.uk:76902 |