Hughes, B.R., Nasir, D.S.N.M., Huang, H. orcid.org/0009-0006-2833-5496 et al. (3 more authors) (2026) Defining the future of construction at scale and pace: a TFV-reinforced evaluation framework validated through an on-site factory demonstrator. Journal of Building Engineering, 131. 117250. ISSN: 2352-7102
Abstract
Global demand for affordable, sustainable and rapidly deployable housing has intensified needs for construction methods that deliver higher productivity, lower carbon impact and resilience to logistical and financial constraints. Traditional site-based production, although adaptable, is restricted by sequential trade workflows, weather exposure, variable workmanship and high waste. Off-site modular production offers factory-controlled precision, reduced environmental impact and shorter on-site durations, yet adoption is constrained by transport limits, high capital requirements, factory-capacity bottlenecks and regulatory challenges linked to volumetric certification. This research evaluates an emerging hybrid alternative of on-site “factory-in-a-box” model deploying a temporary, rapidly assembled manufacturing facility directly at the construction site. A new TFV-reinforced framework was proposed to compare traditional site, off-site modular and on-site factory systems across operational, environmental, economic and social dimensions based on seven indicators scored using five-point Likert scale. A full-scale demonstrator benchmarked economic performance (£/m2) against UK theoretical cost datasets. Two dwellings were produced in ten days at a total cost of £62,000, with subsequent units achievable in under five days at significantly reduced marginal cost. The on-site factory model achieved a TFV score of 30, outperforming traditional site (22) and off-site modular (23). It retained modular productivity, quality and environmental benefits while reducing capital intensity, logistics complexity and programme risk. Economic benchmarking showed a unit rate of £313.13/m2, with cost-variability advantages of 83-88% and stability gains of 74-92%. Findings indicate that site-embedded factory production offers a viable, lower-risk pathway for accelerating housing delivery where transport, financial or schedule constraints limit conventional modular construction.
Metadata
| Item Type: | Article |
|---|---|
| Authors/Creators: |
|
| Copyright, Publisher and Additional Information: | © 2026 The Authors. Except as otherwise noted, this author-accepted version of a journal article published in Journal of Building Engineering is made available via the University of Sheffield Research Publications and Copyright Policy under the terms of the Creative Commons Attribution 4.0 International License (CC-BY 4.0), which permits unrestricted use, distribution and reproduction in any medium, provided the original work is properly cited. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ |
| Keywords: | On-site modular construction; Industrialised housing production; Factory-in-a-box; Housing delivery efficiency; Construction logistics and capital risk; Sustainable construction methods |
| Dates: |
|
| Institution: | The University of Sheffield |
| Academic Units: | The University of Sheffield > Faculty of Engineering (Sheffield) > School of Mechanical, Aerospace and Civil Engineering |
| Date Deposited: | 30 Sep 2026 08:24 |
| Last Modified: | 30 Sep 2026 08:24 |
| Status: | Published |
| Publisher: | Elsevier BV |
| Refereed: | Yes |
| Identification Number: | 10.1016/j.jobe.2026.117250 |
| Sustainable Development Goals: | |
| Open Archives Initiative ID (OAI ID): | oai:eprints.whiterose.ac.uk:246091 |
Download
Filename: Manuscript_Revision_Version_02.pdf
Licence: CC-BY 4.0


CORE (COnnecting REpositories)
CORE (COnnecting REpositories)