(2023) Status report of the n_TOF facility after the 2nd CERN long shutdown period. EPJ Techniques and Instrumentation. 13. ISSN: 2195-7045
Abstract
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.
Metadata
| Item Type: | Article |
|---|---|
| Copyright, Publisher and Additional Information: | © The Author(s) 2023 |
| Keywords: | Neutron induced fission,Neutron physics,Neutron reactions,Neutron time of flight,Nuclear astrophysics,Spallation target |
| Dates: |
|
| Institution: | The University of York |
| Academic Units: | The University of York > Faculty of Sciences (York) > Physics (York) |
| Date Deposited: | 13 Mar 2026 09:10 |
| Last Modified: | 06 May 2026 04:33 |
| Published Version: | https://doi.org/10.1140/epjti/s40485-023-00100-w |
| Status: | Published |
| Refereed: | Yes |
| Identification Number: | 10.1140/epjti/s40485-023-00100-w |
| Related URLs: | |
| Open Archives Initiative ID (OAI ID): | oai:eprints.whiterose.ac.uk:239089 |
Download
Filename: s40485-023-00100-w.pdf
Description: Status report of the n_TOF facility after the 2nd CERN long shutdown period
Licence: CC-BY 2.5
CORE (COnnecting REpositories)
CORE (COnnecting REpositories)