Lestari, P.D.R. orcid.org/0000-0002-9205-3067, Liu, R. orcid.org/0000-0003-0627-3184 and Batley, R. orcid.org/0000-0002-2487-850X (2026) A demand response to line planning. Multimodal Transportation, 5 (2). 100285. ISSN: 2772-5871
Abstract
As a linking factor between supply and demand, line planning is a crucial aspect of long-term railway planning. It aims to create a viable line system that optimises specific objectives by determining stop patterns and service frequencies to meet the predicted passenger demand. In the proposed model, railway operators can choose from different line plan designs based on line planning outcomes. The objective functions include economic objectives, focusing on either cost or capacity. We introduce a model to examine how demand responds to different line plans. This study focuses on stop patterns and service frequencies as the primary factors of line plan-related service quality. The model is intended as a tool for policymaking and evaluating attractiveness through metrics including generalised journey time (GJT) and/or generalised cost. The changes in demand for different line plan designs are simulated using the proposed metrics until equilibrium between the assignment and demand model is reached. This proposed model represents a significant advancement, providing reliable line plans for decision-making. It applies a similar approach commonly used for timetable-related service quality, enhancing railway planning effectiveness. To validate the model, we present a case study of a small-scale future network for Indonesia’s Jakarta-Surabaya semi-high-speed train.
Metadata
| Item Type: | Article |
|---|---|
| Authors/Creators: |
|
| Copyright, Publisher and Additional Information: | © 2025 The Author(s). Published by Elsevier Ltd on behalf of Southeast University. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). |
| Keywords: | Railway planning; Line planning; Demand; Line plan-related service quality; Generalised journey time; Generalised cost |
| Dates: |
|
| Institution: | The University of Leeds |
| Academic Units: | The University of Leeds > Faculty of Environment (Leeds) > Institute for Transport Studies (Leeds) |
| Date Deposited: | 21 Jan 2026 16:01 |
| Last Modified: | 21 Jan 2026 16:01 |
| Status: | Published |
| Publisher: | Elsevier |
| Identification Number: | 10.1016/j.multra.2025.100285 |
| Related URLs: | |
| Open Archives Initiative ID (OAI ID): | oai:eprints.whiterose.ac.uk:236561 |
Download
Filename: 1-s2.0-S2772586325000991-main.pdf
Licence: CC-BY-NC-ND 4.0

CORE (COnnecting REpositories)
CORE (COnnecting REpositories)