Flyvbjerg, B., Ansar, A., Budzier, A. et al. (11 more authors) (2018) Five things you should know about cost overrun. Transportation Research Part A: Policy and Practice, 118. pp. 174-190. ISSN 0965-8564
Abstract
This paper gives an overview of good and bad practice for understanding and curbing cost overrun in large capital investment projects, with a critique of Love and Ahiaga-Dagbui (2018) as point of departure. Good practice entails: (a) Consistent definition and measurement of overrun; in contrast to mixing inconsistent baselines, price levels, etc. (b) Data collection that includes all valid and reliable data; as opposed to including idiosyncratically sampled data, data with removed outliers, non-valid data from consultancies, etc. (c) Recognition that cost overrun is systemically fat-tailed; in contrast to understanding overrun in terms of error and randomness. (d) Acknowledgment that the root cause of cost overrun is behavioral bias; in contrast to explanations in terms of scope changes, complexity, etc. (e) De-biasing cost estimates with reference class forecasting or similar methods based in behavioral science; as opposed to conventional methods of estimation, with their century-long track record of inaccuracy and systemic bias. Bad practice is characterized by violating at least one of these five points. Love and Ahiaga-Dagbui violate all five. In so doing, they produce an exceptionally useful and comprehensive catalog of the many pitfalls that exist, and must be avoided, for properly understanding and curbing cost overrun.
Metadata
Item Type: | Article |
---|---|
Authors/Creators: |
|
Copyright, Publisher and Additional Information: | © Year Elsevier. This is an author produced version of a paper subsequently published in Transportation Research Part A: Policy and Practice. Uploaded in accordance with the publisher's self-archiving policy. Article available under the terms of the CC-BY-NC-ND licence (https://creativecommons.org/licenses/by-nc-nd/4.0/). |
Keywords: | Cost overrun; Cost underestimation; Cost forecasting; Root causes of cost overrun; Behavioral science; Optimism bias; Strategic misrepresentation; Delusion; Deception; Moral hazard; Agency; Reference class forecasting; De-biasing |
Dates: |
|
Institution: | The University of Sheffield |
Academic Units: | The University of Sheffield > Faculty of Social Sciences (Sheffield) > Management School (Sheffield) |
Depositing User: | Symplectic Sheffield |
Date Deposited: | 03 Dec 2018 14:28 |
Last Modified: | 12 Sep 2019 00:39 |
Published Version: | https://doi.org/10.1016/j.tra.2018.07.013 |
Status: | Published |
Publisher: | Elsevier |
Refereed: | Yes |
Identification Number: | 10.1016/j.tra.2018.07.013 |
Open Archives Initiative ID (OAI ID): | oai:eprints.whiterose.ac.uk:139423 |
Download
Filename: CCT1 Mgt ResponseLoveAhiaga-DagbuiTRA3.3Submit1-1.pdf
Licence: CC-BY-NC-ND 4.0