Priority projects for the implementation of CCS power generation with enhanced oil recovery in Mexico

González-Díaz, A., González-Díaz, M.O., Alcaráz-Calderón, A.M. et al. (2 more authors) (2017) Priority projects for the implementation of CCS power generation with enhanced oil recovery in Mexico. International Journal of Greenhouse Gas Control, 64. pp. 119-125. ISSN 1750-5836

Abstract

Metadata

Authors/Creators:
Copyright, Publisher and Additional Information: © 2017 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/BY/4.0/).
Keywords: CO2 capture; Capture ready; Retrofit; New power plants; Enhanced oil recovery
Dates:
  • Accepted: 5 July 2017
  • Published: 1 September 2017
Institution: The University of Sheffield
Academic Units: The University of Sheffield > Faculty of Engineering (Sheffield) > Department of Mechanical Engineering (Sheffield)
Depositing User: Symplectic Sheffield
Date Deposited: 16 Oct 2017 15:54
Last Modified: 16 Oct 2017 15:54
Published Version: https://doi.org/10.1016/j.ijggc.2017.07.006
Status: Published
Publisher: Elsevier
Refereed: Yes
Identification Number: https://doi.org/10.1016/j.ijggc.2017.07.006

Export

Statistics