Managing Drivers of Cost in the Construction of Nuclear Plants

Ingersoll, E, Gogan, K and Locatelli, G orcid.org/0000-0001-9986-2249 (2020) Managing Drivers of Cost in the Construction of Nuclear Plants. The Bridge, 50 (3). pp. 32-37. ISSN 0737-6278

Abstract

Metadata

Authors/Creators:
Copyright, Publisher and Additional Information: © 2020 by the National Academy of Sciences. All rights reserved. Reproduced with permission from National Academy of Engineering (NAE).
Dates:
  • Accepted: 3 August 2020
  • Published: 15 September 2020
Institution: The University of Leeds
Academic Units: The University of Leeds > Faculty of Engineering & Physical Sciences (Leeds) > School of Civil Engineering (Leeds)
Depositing User: Symplectic Publications
Date Deposited: 24 Sep 2020 13:28
Last Modified: 28 Sep 2020 09:38
Status: Published
Publisher: National Academy of Engineering (NAE)

Export

Statistics