Settlement behaviour of hybrid asphalt-ballast railway tracks

Yu, Z, Connolly, DP, Woodward, PK et al. (1 more author) (2019) Settlement behaviour of hybrid asphalt-ballast railway tracks. Construction and Building Materials, 208. pp. 808-817. ISSN 0950-0618

Abstract

Metadata

Authors/Creators:
  • Yu, Z
  • Connolly, DP
  • Woodward, PK
  • Laghrouche, O
Copyright, Publisher and Additional Information: (c) 2019, Elsevier Ltd. All rights reserved. This is an author produced version of a paper published in Construction and Building Materials. Uploaded in accordance with the publisher's self-archiving policy.
Keywords: Railway track settlement; Laboratory railroad testing; Asphalt-bitumen railway; Railway track stiffness; Subgrade transition zone; Railroad asphalt; Railway engineering; Railway track design; Permanent way construction; Asphaltic-bituminous track design
Dates:
  • Accepted: 5 March 2019
  • Published (online): 18 March 2019
  • Published: 30 May 2019
Institution: The University of Leeds
Academic Units: The University of Leeds > Faculty of Engineering & Physical Sciences (Leeds) > School of Civil Engineering (Leeds)
Depositing User: Symplectic Publications
Date Deposited: 03 Apr 2019 14:34
Last Modified: 18 Mar 2020 01:38
Status: Published
Publisher: Elsevier
Identification Number: https://doi.org/10.1016/j.conbuildmat.2019.03.047

Download

Export

Statistics